I-69 Section 4 opens tomorrow
Interstate 69’s Section 4 opens tomorrow, connecting Naval Support Activity Crane to Bloomington. This strip runs 27 miles from U.S. 231 near Crane, to S.R. 37 south of Bloomington.
The decision to work on this project was made on September 8, 2011, with actual construction beginning January 2012.
For section 4, INDOT utilized a solid public involvement environmental study process to analyze the surrounding ecosystems. The section opens in time for those who live in the area to safely go back home for the winter break.